香港木庫 HK TimberBank

ReDESIGN / 項目展示

俊和方永勝梅窩地盤辦公室環保設施提昇 CChunwo-FongwingshingJV Mui Wo Site office eco-upgrades

CChunwo-FongwingshingJV Mui Wo Site office

俊和方永勝梅窩地盤辦公室環保設施提昇
CChunwo-FongwingshingJV Mui Wo Site office eco-upgrades

  • 商業
  • 家具
  • 戶外的
  • 標示牌
尺寸 各種
品種 Casuarina equisetifolia L / Araucaria cunninghamii
設計元素 Signage / bespoke furniture
顏色 mid-toned / light-toned
地點 Mui Wo
樹木來源 Mui Wo
客戶 CEDD
Main Contractor CW-FWSJV
Design & production 香港木庫
完成日期 2024 年 5 月
CChunwo-FongwingshingJV Mui Wo Site office
CChunwo-FongwingshingJV Mui Wo Site office

Project Background

The project is an improvement works of Mui Wo Ferry Pier and reprovision of facilities in vicinity of the Pier as part of CEDD Lantau Island development. It beginned with several tree felling works in 2023. Chunwo-Fongwingshing Joint-Venture (CW-FWSJV) called up HK Timberbank to collect and upcycle the proposed felled trees for future use.

Recycle process

Partnering with Timber Research & Education Foundation TREF, a registered s88 Charitable organization, and supported by Master of Environmental Management of the University of Hong Kong (MscENVM), tree carbon survey is being conducted on site with the tree felling practise. With generous support of the client CEDD, and immense effort of coordination among Chun Wo and the fellow arbor contractor Toyogreen 東陽綠化 with TREF and Timberbank team, tree datas and abandon tree samples were being collected for further analysis to assist TREF to build local tree carbon database.

CChunwo-FongwingshingJV Mui Wo Site office
CChunwo-FongwingshingJV Mui Wo Site office
CChunwo-FongwingshingJV Mui Wo Site office

ReDesign

The felled trees were collected and kiln dried in Timberbank and further made into facilities upgrade for CW-FWSJV site office. A signage of “CW-FWSJV”made from Casuarina equisetifolia L (Horse-tail Tree) and two set of movable table and chair set made from Araucaria cunninghamii (Hoop pine). More projects are coming.

CChunwo-FongwingshingJV Mui Wo Site office
CChunwo-FongwingshingJV Mui Wo Site office

俊和方永勝梅窩地盤辦公室
環保設施提昇
CChunwo-FongwingshingJV
Mui Wo Site office eco-upgrades

2024 MAY
Dimensions: various
Client: CEDD
Main Contractor: CW-FWSJV
Location: Mui Wo
Design & production: HK Timberbank

標示牌 | Bespoke Furniture | Casuarina equisetifolia L  | Araucaria cunninghamii